The Port will acquire Two (02) units of
third generation Quay Cranes backed up by Four (04) units
Transtainers at the yard, to service the fully Containerised
Vessels which would be receiving priority services at this
Terminal. To offer a high degree of flexibility, this equipment
will be further supported by the latest ReachStacker machines
which would provide optimal utilisation of available stacking
areas with the minimum time delays.
To ensure uninterrupeted service to the
Vessels, the Terminal will have a fully equipped modern
workshop which would have the capacity to support all of
the new equipment. This workshop will be manned by experienced
and factory trained personnel who would ensure minimum downtime
for the machinery. The state of the art equipment in use,
will ensure that fault diagnosis will be carried out with
the minimum of delay. Thus providing for the demanding services
required from these machines.