Facilities
The facilities available at the
Multi-Purpose Berth at present, are
capable of servicing Conventional
Cargo Carriers, Self-sustained
Container Carriers, and Ro-Ro
Car-Carriers which usually ply the
trade routes in this region.
The access to the commercial berth
is through a dredged canal 2.6
kilometres long and which could
accommodate Vessels with a maximum
draught of 9.5 metres. The depth
alonside is 10 metres, and is
capable of accommodating second
generation Containerised Vessels.
The Berth planning unit provides a
scheme whereby Mother/Feeder Vessels
are given priority services to meet
their critical shipping schedules.
This scheme is further extended to
cover Vessels having fixed-day
sailing schedules from/to Singapore
and the EAGA region.
The Refrigerated Container facility
at this Terminal will provide 100
universal plug points to cater for
imported as well as transit
refrigerated cargo. To assure a very
high quality service for this
expensive cargo, the Reefer facility
will be fully backed up by a Reefer
Container monitoring service. This
will guarantee the Shipper/Consignee
that the cargo is maintained at the
required critical temperatures
during the full transit period. An
independent power supply source is
available to ensure continuous power
supply for the safety of the cargo.
Storage Facility
The total terminal facility will cover
an area of 10 hectares giving a
container stacking area of 50,000 square
metres. This is expected to give an
additional storage capacity of 3,000
Teus for laden Containers and a further
2,500 Teu's for empty containers. For
more versatility in operations, the yard
equipment will be backed by a fleet of
the latest Reach Stacker Machines, which
could meet any unexpected downtime due
to breakdown of yard gantries.
|