Supporting Landside Services
The Port will acquire Two (02) units of third generation Quay Cranes backed up by
Four (04) units Transtainers at the yard, to service the fully Containerised Vessels
which would be receiving priority services at this Terminal. To offer a high degree
of flexibility, this equipment will be further supported by the latest ReachStacker
machines which would provide optimal utilisation of available stacking areas with
the minimum time delays.
To ensure uninterrupeted service to the Vessels, the Terminal will have a fully equipped
modern workshop which would have the capacity to support all of the new equipment.
This workshop will be manned by experienced and factory trained personnel who would
ensure minimum downtime for the machinery. The state of the art equipment in use,
will ensure that fault diagnosis will be carried out with the minimum of delay. Thus
providing for the demanding services required from these machines.